New at StuderendeOnline? Join us!

Profile #213120

I am a guest PhD student at Aalborg University with valuable experience of executive tasks in power distribution system projects.

Updated 21. december 2018
My education
2018 - 2019

ph.d. (erhverv)

Aalborg Universitet

Educational area: Klima, Miljø & Energi
Period: juli 2018 - marts 2019
My work experience
2017 - 2018

Designer and technical supervisor

As a new area of experience, I worked as a decorative lighting designer for Masoumeh Holly Shrine in Qom. The outdoor lighting comprise of 9 meter towers as well as 3 meter lighters were specifically designed, casted, and implemented. Besides, light stones of pavement were installed with harmonic light colors and their control panels.
Work area: Arkitektur & Design
Period: september 2017 - marts 2018
2017 - 2017

Technical supervisor and coordinator

The project was located beside Abadan Refinery, south of Iran. My team was responsible for commissioning of substations. It was to supply power for pumps to provide water from Bahmanshir River to Abadan Refinery through a highly populated residential area. The challenge of working under high limitations was valuable and educating. Moreover, installing cables under grounds at sea level had difficulties.
Work area: Topledelse
Period: april 2017 - juli 2017
2016 - 2016

Execution leader and project manager

I have work as a team leader and coordinator of the lighting project of Naein Industrial Town near Isfahan. The contract included the providing of materials as well as human resources. The quality and progress of project was amazing so the similar project of Komshecheh Industrial Town was delivered to my team successively.
Work area: Topledelse
Period: maj 2016 - september 2016
2014 - 2015

execution leader and technical supervisor

I have worked in cabling and instrumentation of boilers in Arman Petrochemical Industries in Asalooyeh, south of Iran. My main job was to direct the execution team and to prepare daily reports for the headquarter of PACMAN Co. in Tehran. I had to make sure that all standards of oil industry is respected and manuals of Danfos and other equipment are thoroughly studied and implemented by the workers.
Work area: Ledelse & Planlægning
Period: december 2014 - april 2015
2012 - 2014

Technical supervisor

I have experience of supervising projects related to power distribution system installations. My responsibilities include plan checking, route optimization, and project management. I have participated in buried cable as well as aerial distribution line installations (63kv and 20kv). The total amount of cabling distance exceeds 200Kms using cable type NA2XSYBY.
Additionally, total number of 15 compact substations and 90 step down distribution transformers were installed (63kv/20kv, and 20kv/400v). Their ranging was 315KVA up to 1500KVA.
This project was a part of Foolad Shahr new residential city under responsibility of Pishtazan Bardin Co. and ASA Group as the second hand contractor company. The plan was to accommodate 15000 unit apartments in a 273-hectare land.
Work area: Topledelse
Period: juli 2012 - april 2014
My skills and abilities
Skills
lighting design power distribution system developer project manager quality control inspector technical supervior
Skills at working proficiency
dansk english persian
My preferences
Job type