Senior Piping Engineer | Mechanical Engineering | Project Management

Piping Engineer  

Updated 28. oktober 2025
My education
1998 - 2003

Anden lang videregående udd.

Anden uddannelsesinstitution i udlandet

University of Guilan
Educational area: Maskin & Design
Period: februar 1998 - februar 2003
My work experience
2020 - 2025

Lead Piping Engineer

PNS

Flare Gas Compression and Dehydration Plant (PNS) www.pnsgroup.co
Zero flaring project
Piping System Design
  • I developed and optimized piping system designs by generated layout and isometric drawings, specifications, reports and calculations for liquid, gas, oil, air, steam and water supply systems. This was achieved through close collaboration with multidisciplinary teams and validating designs against vibration and reliability requirements to ensure fully integrated, safe, and efficient piping layouts that resulted in design reliability improved by 15%.
  • I developed technical documents during design reviews and discussed with my colleagues and stakeholder representatives by technical correspondence to clarifying requirements to ensure alignment with quality and safety standards to maintain product integrity and strengthen customer support. As a result, client-reported design issues decreased by 25%, improving satisfaction and reliability.
  • Procurement Services
  • I monitored all deliverables provided by vendors/suppliers to ensure that designs and materials complied with project specifications and quality standards. This was achieved through systematic inspections, document reviews, and coordination with the quality control team. The goal was to maintain compliance and uphold project quality requirements, which resulted in reduced non-conformities and ensured smooth approval of materials for construction
  • Installation & Commissioning Support
    • I prepared fabrication and installation work packages and provided technical support throughout the prefabrication, installation, and completion phases. This was achieved by developing detailed work instructions, coordinating with production teams, monitoring progress, and resolving technical issues on-site. The goal was to ensure safe, accurate, and timely execution of all fabrication and installation activities. As a result, fabrication rework was reduced by 15%, and installation and takeover were completed on schedule in 95% of cases.
    Work area: Konstruktion & Beregning
    Period: februar 2020 - oktober 2025
    2017 - 2020

    Piping Senior Engineer / Project Coordinator

    Norahan

    Sulphur Recovery Petrochemical Plant (Norahan) www.norahan.com
    Piping System Design
  • I prepared detailed design documentation, including 3D models, plot plans (layouts), specifications, calculations, material take-off (MTO), and reports to support various project delivery phases. Additionally, I reviewed and provided
  • 2
    guidance on documents from other disciplines such as PFDs, P&IDs, data sheets, drawings, and specifications. This was achieved through careful coordination, technical verification, and adherence to project standards to ensure accuracy, consistency, and alignment across multidisciplinary engineering deliverables that caused design errors were reduced by 20%, improving overall project quality and minimizing rework during later phases.
  • I monitored all supplies provided by vendors to verify that designs and materials met project specifications and quality standards. This was achieved by conducting thorough inspections, cross-checking supplier documentation, and coordinating with vendors to resolve discrepancies. The goal was to maintain compliance, prevent delays, and ensure smooth procurement and construction phases. As a result, non-conforming materials were reduced by 15%, leading to improved project reliability and on-time delivery.
  • Procurement Services
  • I prepared technical clarifications and reviewed all vendor technical proposals and deviation lists to finalize the Technical Bid Evaluation (TBE). In addition, I checked packing lists and compared them with the Project Material Specifications (PMS) and Material Take-Off (MTO) to ensure accuracy and completeness. This was done through detailed verification, cross-referencing, and close coordination with vendors. The goal was to secure technically compliant and cost-effective procurement decisions. As a result, procurement errors were reduced by 10%, ensuring timely material availability and supporting smooth project execution.
  • Construction – Erection & Installation
    • I conducted field surveys and assisted in the preparation of as-built drawings. In addition, I prepared fabrication and installation work packages such as execution plan, workflows and provided technical support throughout the prefabrication, installation, and completion phases. This involved developing detailed work instructions, coordinating with construction and production teams, monitoring progress, and resolving technical queries on-site to ensure safe, accurate, and timely execution of all fabrication and installation activities that resulted fabrication rework was reduced by 10%, and installation and takeover were successfully completed on schedule in 90% of cases.
    Work area: Rådgivning & Support
    Period: november 2017 - januar 2020
    My skills and abilities
    Skills
    api astm autocad dnv dynamic environments • technical communication • e3d/pdms installation & commissioning support • asme iso navisworks norsok plant 3d • fabrication
    Skills at working proficiency
    azerbaijani english turkish
    My preferences
    Job type
    Deltidsjob Fuldtidsjob Vikariat
    Work areas
    Arkitektur & Design Konstruktion & Beregning Ledelse & Planlægning Produktion Projektledelse Rådgivning & Support
    Location
    Nordsjælland Storkøbenhavn Sydvestjylland (Esbjerg) Udlandet (Norge) Udlandet (Sverige) Udlandet (øvrige)
    Salary
    36.000 DKK / month
    Contact me!


    HPT